Manage Breakpoints
Specifies the options for breakpoints.
Puncte de întrerupere
Enter the line number for a new breakpoint, then click New.
Activ
Activates or deactivates the current breakpoint.
Pass Count
Specify the number of loops to perform before the breakpoint takes effect.
Nou
Creates a breakpoint on the line number specified.
Șterge
Deletes the selected breakpoint.